AIRPORT PLANNING AND DESIGN
|
- Airport Layout Plans (ALP)
- Runway & Taxiway Design
- Drainage & Pavement Design
- FAR Part 77 Obstruction Surveys
- Navigational Aid Siting
- Hangars & Terminal Planning
- Obstruction Clearing and/or Lighting Plans
- Fueling Systems
|
|
|
RUNWAY, TAXIWAY, AND RAMP DESIGN/CONSTRUCTION SERVICE EXAMPLES
|
- Relocation of the Rice Lake, Wisconsin Airport (RPD) to a new site. Several sub-projects included Runway 1-19, the terminal ramp, Runway 13-31, several taxiways, and the development of hangar areas.
- New primary Runway 3-21 at Superior, Wisconsin Airport (SUW). The 5,100 foot Runway 3-21 and connecting taxiway were designed and constructed on a site consisting largely of wetland. Soft clay subsoils required special design to provide a well-drained pavement structure and construction site.
- Runway 17-35 and ramp reconstruction at the Chetek, Wisconsin Airport (Y23). This project included replacement of the existing runway edgelights. Minor ramp and taxiway expansions were also included.
- Terminal ramp reconstruction/expansion at Superior, Wisconsin Airport (SUW). This project included the total reconstruction of the airport's severely deteriorated ramp and landside pavements. Storm sewer and pavement underdrains were included to provide a long-life pavement over the native soft clay. The project included a fuel system upgrade, rerouting of airfield lighting homerun circuits, and extensive coordination with various utilities serving tenant hangars.
|
|
AIRPORT PLANNING EXAMPLES
|
- Airport Layout Plan (ALP) update for Cumberland, Wisconsin Airport (UBE).
- Airport Layout Plan (ALP) and updates for new Rice Lake, Wisconsin Airport (RPD).
- Airport Layout Plan (ALP) for Madeline Island Airport, LaPointe, Wisconsin (4R5).
- Airport Layout Plan (ALP) update for Chetek, Wisconsin Airport (Y23).
- Environmental Assessments (EA) for various projects at Rice Lake, Wisconsin Airport (RPD), new airport, runway lengthening/widening, and MALS installation.
- Several obstruction surveys per FAR Part 77 – Objects Affecting Navigable Airspace, and FAA Specification 405, various airports.
- Several boundary surveys for land acquisition at various airports - fee simple and easements.
|
|
NAVIGATIONAL AID SITING EXAMPLES
|
- VOR/DME relocation from old Rice Lake, Wisconsin Airport to the relocated airport.
- Medium Intensity Approach Lighting System with RAILS (MALS-R), Runway 1, Rice Lake, Wisconsin Airport. Included coordination with FAA for incorporation into FAA maintained ILS. Siting assistance to FAA during installation of Glide Slope and Localizer for FAA ILS.
- Precision Approach Path Indicator (PAPI) and Runway End Identifier (REIL) sitings for several airports in Wisconsin.
|
|
|
| Cooper Engineering |
| 2600 College Drive |
| P.O. Box 230 |
| Rice Lake, WI 54868 |
| Phone: 715-234-7008 |
| Fax: 715-234-1025 |
| info@cooperengineering.net |
|
Cooper Engineering Company, Inc., is an employee-owned civil engineering consulting firm based in Rice Lake, WI. Our staff of 35 engineers, surveyors, scientists , and technicians provides service to local, state and federal governments, developers, business and industry in northwestern Wisconsin.
Cooper Engineering,Rice Lake Wisconsin,civil engineering,consulting engineer,municipal engineering,transportation engineering,structural engineering,environmental services,surveying,airport planning,design engineering,wastewater treatment,wetland mitigation,bridge design and inspection,GIS,GPS,sanitary sewer,storm sewer,certified survey map,materials testing,construction inspection,groundwater contamination,landfill design,erosion/sediment control,water towers,aquaculture,remediation,site assessment,site design/development,fish hatchery,concrete testing,soil testing,storm water management,sewer design,ALTA survey,asphalt testing